Skip to content
Watson Removals & Storage, Brighton
Watson Removals team and branded moving vehicle
Back to blog

Office relocation checklist for Sussex businesses

Business Updated 19 November 2026 8 min read

To relocate an office successfully, appoint a coordinator, confirm access at both buildings, agree a floor plan and schedule your IT changeover before packing begins. Work backwards from the date your Sussex business needs to be operational, not simply the day the vehicles arrive. This checklist covers the practical decisions that help Brighton & Hove businesses, and teams across East Sussex and West Sussex, avoid preventable disruption.

1. Set the timetable and assign responsibility

Start once the new premises and likely handover date are clear. The preparation period varies with office size, lease arrangements, fit-out work and supplier lead times. Build a shared task list with dependencies: desks cannot be positioned until rooms are ready, and staff cannot resume normal work until essential systems have been tested. Leave room for delays rather than planning every task back-to-back.

  • Name a move coordinator with authority to approve decisions, plus a deputy who can cover absences or problems on the day.
  • Agree the moving date, the target reopening date and any period when customer-facing services will be reduced.
  • Assign owners for premises, IT, packing, staff communications and supplier updates, with deadlines visible to everyone involved.
  • Choose which activities must continue throughout the move and arrange temporary working methods, subject to security and operational requirements.

2. Get a useful survey and a clear quotation

A meaningful removals quotation depends on more than the number of desks. Provide an inventory, photographs where useful and accurate access details for both sites. Explain what needs dismantling, what must remain upright and what requires specialist handling. Costs vary with volume, distance, staffing, access, packing requirements, storage and scheduling. Ask for a written scope so you can compare what is included rather than headline figures alone.

  • List desks, chairs, cabinets, meeting-room furniture, boxed records, kitchen contents and any equipment outside ordinary office handling.
  • Identify heavy or awkward items, including safes and large printers, and confirm whether specialist contractors are needed.
  • Specify whether you want packing, unpacking, furniture dismantling or reassembly, and confirm who supplies crates and protective materials.
  • Ask how changes to inventory, waiting time, access restrictions or extra journeys would affect the agreed scope and charges.

3. Check loading, parking and building access

In Brighton & Hove, do not assume a space outside the office can be used for loading throughout the move. Check the actual restrictions at each address and ask the relevant council about any permissions or parking bay suspensions needed. Elsewhere in Sussex, establish which authority manages the location. Private forecourts, shared yards and managed buildings also require permission from the appropriate owner or manager.

  • Walk the route from the proposed vehicle position to each office, noting steps, narrow doors, turns and the carrying distance.
  • Confirm loading hours, vehicle restrictions and whether pedestrians, neighbouring businesses or shared entrances need to remain unobstructed.
  • Book any service lift and check its dimensions, load limit and operating arrangements with the building manager.
  • Arrange keys, access cards and alarm instructions, and agree protection for floors, doorways and lifts without blocking fire routes.

4. Prepare the destination before anything arrives

Give the removals team a floor plan that reflects the layout staff will actually use. Mark rooms and workstations consistently, and check that larger furniture will fit through doors and into its allocated position. Where the new office needs decorating, electrical work or repairs, agree completion and sign-off before delivery. Moving furniture into unfinished rooms often creates extra handling and makes it harder to restart work.

  • Confirm room names, desk positions, storage areas and meeting spaces, with clear routes to exits and accessible facilities.
  • Check power and data points against the planned layout rather than assuming existing sockets will serve every workstation.
  • Verify that cleaning, essential repairs and building handover are complete, and record the condition of the new premises.
  • If the dates do not align, discuss storage in advance and identify items needed sooner so they remain accessible.

5. Plan IT continuity separately from transport

Transporting computers is only one part of an IT move. Your IT lead or provider should own backups, shutdown, disconnection, network configuration and testing. Confirm internet installation and activation directly with the provider, then test the connection before relying on it. Decide the order in which systems must return, starting with the services your business cannot operate without.

  • Create an equipment list with asset identifiers, users and destination locations, including shared devices and network hardware.
  • Complete verified backups before shutdown and confirm how authorised staff will recover data if equipment fails or is delayed.
  • Label cables and components clearly, and agree suitable packaging and handling for screens, computers and other sensitive equipment.
  • Prepare a fallback for essential communications and test telephones, remote access, printing and key applications at the new site.

6. Pack by destination and protect confidential material

Packing works best when every container has a clear destination and an accountable owner. Use a simple label such as room, workstation and crate number, linked to your inventory. Avoid displaying sensitive client information on the outside. Keep confidential files, access credentials and valuable portable equipment within an agreed handling process, rather than mixing them into general office boxes.

  • Set a packing deadline for each department and separate items still needed for the final working day.
  • Empty drawers and cabinets unless the removals team specifically agrees otherwise; secure loose parts and label dismantled components together.
  • Use sturdy containers, protect fragile contents and keep loads manageable, especially when packing dense paper records.
  • Allocate sealed containers for confidential records, nominate authorised handlers and reconcile them at collection and delivery without exposing their contents.

7. Brief staff, customers and suppliers

Staff need practical instructions, not just an announcement of the new address. Explain where they should work during the changeover, what they must pack and when their desks will be available. For a Brighton & Hove or wider Sussex move, share clear arrival information and encourage people to check their own travel options. Keep external messages accurate about any temporary service changes.

  • Issue a staff briefing covering packing rules, personal belongings, access arrangements, temporary working and the first day at the new office.
  • Discuss accessibility requirements privately and make appropriate arrangements for arrival, workstations and movement around the building.
  • Notify customers and suppliers of the effective address change and any altered collection, delivery or appointment arrangements.
  • Schedule updates to the website, email signatures, invoices and relevant listings, and arrange mail redirection where appropriate.

8. Run moving day from one agreed plan

Have a responsible contact at each premises with the inventory, floor plan and access information. Keep instructions flowing through the coordinator so different departments do not give conflicting directions. Before loading starts, check that essential working equipment and items travelling separately have been set aside. At the destination, placing furniture correctly first reduces unnecessary lifting and keeps unpacking organised.

  • Walk through both sites with the relevant contacts, confirming loading positions, protected surfaces and areas that must stay clear.
  • Record collections against the inventory and highlight priority deliveries, such as equipment needed for IT setup or reception.
  • Direct labelled items to their allocated rooms, keeping corridors, exits and shared spaces free of crates and furniture.
  • Before the final vehicle leaves, check remaining rooms and storage areas, note any issues and agree the next action.

9. Reopen carefully and close out the old office

Allow time for a controlled restart rather than assuming everything will work as soon as it is unpacked. Test essential services with the people who use them, and keep a shared snagging list with named owners. Separately, complete the old property's handback obligations. Retained files, redundant equipment and unwanted furniture need deliberate decisions, not a last-minute pile left for someone else.

  • Check internet access, calls, business software and shared equipment, then confirm that staff have safe, usable workstations.
  • Reconcile equipment and confidential records, report damage or missing items promptly, and retain relevant photographs and paperwork.
  • Complete agreed cleaning and reinstatement, record meter readings where applicable, and return keys or access cards with handover confirmation.
  • Use appropriate waste and recycling arrangements for unwanted items, checking the collector's authorisation and required paperwork, including for electrical equipment.

Watson Removals Brighton is a family-run local removals company covering Brighton & Hove, East Sussex and West Sussex, with moves to London and UK-wide. To discuss an office move, contact the team with your addresses, preferred dates, inventory and access details. Call 01273 257230 or email info@watsonremovalsbrighton.co.uk. Office removals, packing and storage can be discussed around your business's requirements.

FAQs

Questions about this moving guide

01How early should we start planning an office relocation?

Begin when the new premises and likely handover date are clear. The lead time varies with your inventory, building requirements, fit-out and connectivity arrangements. Confirm supplier availability early, then work backwards from the date you need the business fully operational.

02Do we need a parking suspension for an office move in Brighton & Hove?

That depends on the loading location and its restrictions. Check both addresses and ask the council about any necessary permissions or bay suspensions before the move. A private loading area may instead require agreement from the landlord or building manager.

03Who should disconnect and reconnect our office IT?

Your IT lead or provider should manage shutdown, disconnection, backups, configuration and testing. Agree transport and protective packing separately with the removals company. Do not assume moving equipment includes technical setup or responsibility for restoring business systems.

04What affects the cost of an office move?

The cost varies with the volume of items, travel distance, access, staffing, scheduling, packing, furniture work and any storage required. Supply a detailed inventory and access information, then request a written quotation that identifies inclusions, exclusions and how changes are handled.

Talk to us about your Brighton move

Add your addresses, moving date and the belongings you are taking. Ask for packing or storage if you would like those included in the quote.

Request your Brighton moving quote

Tell us about your move for a free, no-obligation quote.